View of the sink side, before.

View of the stove side, before.

View of the passage to the living room, before.

View of the sink side, during (1)

View of the stove side, during (1)

View of the passage to the living room, during (1).

Texturing the ceiling.

Sink side with wall cabinets (1).

Sink side with wall cabinets (2).

Stove side with wall cabinets and new microwave.

Sink side with all cabinets installed.

Stove side with all cabinets and new door.

Sink side – almost done.

Range side – almost done.

New door – primed for painting.

Nook – base coat applied.

Sink side – finished.

Range side – finished.

Nook – finished (1).

Nook – finished (2).

 

Living room floor torn up.

New living room floor.

Living room – finished (1).

Living room – finished (2).


Last Updated: April 4, 2004.

Back to The Colwells' home page .